Learn it by doing it.
Each guide is one worked example, click by click, with a screenshot for every step.
- Sites and racks
Your first rack, step by step
Start from nothing: add a site, a room and a row, then create a rack and open its elevation.
5 steps · about 3 min - Devices
Adding devices, step by step
Add a switch from the template library and a server with hand-entered ports, and place both in a rack.
5 steps · about 5 min - Connections
Connect devices, step by step
Cable a switch port to a server port, record the cable's type and ID, and check both ends.
5 steps · about 2 min - Patch panels
Patch panels, step by step
Create two patch panels with a trunk between them, connect a switch in one rack to a server in the other, and trace the run end to end.
8 steps · about 5 min - Patch panels
Cassette patch panels, step by step
Document a cassette chassis whose cassettes land in different racks, fed by MPO trunks, LC harnesses or copper trunks: name the ports by trunk, record each trunk, then patch and trace a run.
8 steps · about 10 min
More guides are on the way. Is there something you'd like explained? Tell us.
Stop guessing where the cable goes.
Free while in beta · No credit card · UK-hosted · Online in minutes